Wilson Construction – Mississippi River
Cable Jointing Project – 2500mm2 Enamel Stranded Conductor – New Orleans – USA
This project for New Orleans and Wilson Construction involved a 2500mm2 enamel stranded conductor work that required a rare skill set. Each stranded conductor has to be individually bead blasted and prepped for jointing, as it spanned the Mississippi river and was one of the few power components that survived hurricane Katrina. Campbell White are called upon globally for critical installs and repairs.
Contact Us
Address
10 Tasma Street, Launceston, Tasmania 7250
Phone
+61 419 357 763
Email Us
Power Solutions
- XLPE Cable Jointing
- Power cables fluid filled
- Pipe type cable (HPPT)
- Gas Filled Power Cable Jointing
- Cable jointing subsea
- DC Links Jointing
- Design & Construct