Oslo 400kV Transition Joint Oil to XLPE – Nexans Norway
This 2000mm2 Copper XLPE to 1600mm2 SCCF transition joints for Nexans Norway was a massive and complex jointing and termination project taken on by Campbell White. Our staff completed this project on time and with a skill set that very few companies can provide.
These four projects are simply a small cross section of Campbell Whites 250+ jointing projects from around the world. Whether you require a simple 132kV XLPE joint or a complex 400kV transition joint from oil filled to XLPE, then Campbell White have the solution for you.
Contact Us
Address
10 Tasma Street, Launceston, Tasmania 7250
Phone
+61 419 357 763
Email Us
Power Solutions
- XLPE Cable Jointing
- Power cables fluid filled
- Pipe type cable (HPPT)
- Gas Filled Power Cable Jointing
- Cable jointing subsea
- DC Links Jointing
- Design & Construct