Oslo 400kV Transition Joint Oil to XLPE – Nexans Norway

This 2000mm2 Copper XLPE to 1600mm2 SCCF transition joints for Nexans Norway was a massive and complex jointing and termination project taken on by Campbell White. Our staff completed this project on time and with a skill set that very few companies can provide.

These four projects are simply a small cross section of Campbell Whites 250+ jointing projects from around the world. Whether you require a simple 132kV XLPE joint or a complex 400kV transition joint from oil filled to XLPE, then Campbell White have the solution for you.

Contact Us

Address

10 Tasma Street, Launceston, Tasmania 7250

Phone

+61 419 357 763 

Power Solutions

  • XLPE Cable Jointing
  • Power cables fluid filled
  • Pipe type cable (HPPT)
  • Gas Filled Power Cable Jointing
  • Cable jointing subsea
  • DC Links Jointing
  • Design & Construct

Get a Quote